Basic Info.
Usage
Villa, Dormitories, Temporary Offices
Warranty
30-Year Limited Warranty
Interior Decoration
Optional
Origin
Qingdao Shandong China
Product Description
Prefab, which is also also refered to prefab/modular House, is different from Mobile house in terms of mobility and foundation.
Prefab/Modular is consolidated onto the foundation which is bound to touch-down and most of people cannot tell the difference between conventional house and prefab/modular house.
Usually there are various kinds of Prefab/Modular-standard prefab/mudular, luxury prefab house etc. No matter what kinds of prefab, its main components covers following:
I. Main steel frame/stud: Column, beam, truss, secondary structure-profile steel, H sectional steel, square tube, U channel, angle steel, steel kneel etc.
II. Cladding system: Wall and roof panel-corrugated steel sheet/sandwich panel/light weight foaming concrete panel/ceiling panel
III. Decoration: Door/window/shower/toilet/kitchen/bathroom/bedroom layout.
Now we take the erection of standard prefab/modular house to demontrate the installation of prefab/modular.
I. First, line-putting, and fix the ground channel
The base is made by reinforced concrete. Put lines according to the design on the plan, and fix the ground channels to the ground with expansion bolts.
II. Second, fix wall panels
Fix the steel panel into the ground channel, and rivet it to the ground channel. And then fix the top of the wall by channels, by the same way to the ground channel.
III. Third, fix door& windows
Leave the hole for door& window while the wall panels are fixed. Rivet the aluminum channel around the hole for door& windows.
IV. Interval steps
During the interval the electrician could install the distribution line tube, switch board, socket, and put through the lines. Make a outlet for the line on the cover for the line tube on the top of the wall.
V. Fourth, fix ceiling panels
The ceiling panels are panels for insulation on roof. It is high strength and insulative. To make the structure safe, the ceiling panels are fixed to the top channel on wall by hexagonal self-tapping screw. The round of the panels are covered by steel flashing, which makes the joint beautiful and good for drainage.
VI. Fifth, fix roof beams and purlins
To support the roof tile, there are triangle beams and purlins fixed under it, which makes the structure safe and good to drain. During this time you can fix the distribution line and all wires.
VII. Sixth, fix roof tile
Roof tile is the main frame for drainage. It is fixed to purlin with self-tapping screw and fastener. The structure is reasonable, and easy to fix. There is ridge tile covered on it to drain.
VIII. Final, fix the flashings and others
Flashings are joint pieces between wall panels, wall panel and ceiling panel. They are fixed by rivets. It not only connects the roof and wall panel, but also makes the house more beautiful.
Advantage of prefab/modular
A: Fast-construction period
B: Massive production
C: Suit for remote areas
D: Material efficient
E: More sturdy
Packaing: The Prefabricated light steel frame structure package is nude cargo but Longwanyuan shall accompany steel structure compoments with cotton blanket on certain parts to prevent the components from collision.
Shipping: For the Prefabricated light steel frame structure, the shipping is usually with 20ft/40ft shipping container. Longwanyuan shall assign a special team work on the loading to the shipping container in order to put each components in right position and minimum the collison damage during the shipping.
Longwanyuan is deeply looking forward to building business relationship with clients worldwidely.
Address:
Room1801, Longhai Mingzhu Building2, Haier Road178-2, Qingdao, Shandong, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Construction & Decoration, Light Industry & Daily Use, Tools & Hardware
Management System Certification:
ISO 9001
Company Introduction:
Our company supplys different kinds of products. High quality and favaroble price. We′re pleased to get your Inquiry and we will come back to as soon as possible. We stick to the principle of "quality first, service first, continuous improvement and innovation to meet the customers" for the management and "zero defect, zero complaints" as the quality objective. To perfect our service, we provide the products with good quality at the reasonable price.